0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

A trading and pricing method of expansion options for BOT freeway projects in China

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 7, v. 26
Page(s): 1406-1423
DOI: 10.1108/ecam-03-2018-0123
Abstrait:

Purpose

The purpose of this paper is to develop a trading and pricing method of expansion option (EO) model to solve expansion problems of build-operate-transfer (BOT) freeway project.

Design/methodology/approach

This paper proposes anex antemechanism through trading the EO to avoid the transaction costs. By editing the paths generated from binomial option pricing model, this paper establishes an American real option binomial lattice model and evaluates the value of EO. Data are collected from Liaoning province in China and the model is practiced in the context of a BOT freeway in Liaoning province.

Findings

Supported by empirical evidence, this study finds out that there exists a minimum price at which the government can sell the EO and a maximum price that the private sector is willing to pay. When the minimum price is negative, the government should transfer the EO to the private sector free of charge to avoid the transaction costs. Otherwise, the government should sell the EO at a reasonable price to protect public interests.

Practical implications

The study can be used for the government to reducing the transaction costs. By using the trading EO model, the government can sell its share of the EO to the private sector to manage its resources efficiently.

Originality/value

This paper builds a trading EO model to solve expansion problems instead of renegotiations. In addition to reducing the transaction costs for the whole society, trading EO can also raise the respective payoffs of both public and private sectors. An EO trading framework and algorithm is further developed. It realized an American option model, making the owner can exercise the option whenever he wants. Thus, the whole model is adapted to best fit BOT highway practice.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-03-2018-0123.
  • Informations
    sur cette fiche
  • Reference-ID
    10576784
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    26.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine