To insist or to concede? Contractors’ behavioural strategies when handling disputed claims

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 3, v. 26
Page(s): 424-443
DOI: 10.1108/ecam-05-2018-0219
Abstrait:

Purpose

The purpose of this paper is to identify and analyse factors that affect contractors’ behavioural strategies in resolving disputed claims.

Design/methodology/approach

Factors were explored by a literature review and an open-ended questionnaire survey. In total, 9 hypotheses involving 12 factors were developed accordingly. Then a structured questionnaire survey was conducted, and 248 valid questionnaires were received from Chinese contractors. Partial least squares structural equation modelling was employed to test the hypotheses.

Findings

Factors that have the largest impacts on the contractual approach and the relational approach regarding obliging and compromising are favourability of evidence, time pressure and reputation, respectively. Unexpected results show that obliging behaviours are negatively correlated with procedural fairness but positively correlated with occurrence time of the dispute.

Research limitations/implications

The results are based on correlation, although the research design improves the internal validity. Furthermore, this study belongs to single-level research. In the future, researchers can conduct multilevel research to enrich theories.

Practical implications

The findings not only enhance practitioners’ understanding of the factors influencing contractors’ behavioural strategies when dealing with disputed claims, but also offer insights into both parties’ex antefocus of attention on specific factors to facilitate the subsequent dispute resolution.

Originality/value

This study furnishes a nuanced picture of multiple factors’ impacts on contractors’ behavioural strategies of claim-related dispute resolution, and thus supplements the relevant construction dispute management literature. From the perspective of contractual governance, it is one of those exploring drivers of contract application in problem situations. It extends the body of knowledge on this topic and hopefully will encourage more research on contractual governance from the reactive perspective.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-05-2018-0219.
  • Informations
    sur cette fiche
  • Reference-ID
    10576720
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    26.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine