Time delay analysis and constant time-delay compensation control for MRE vibration control system with multiple-frequency excitation
Auteur(s): |
Jie Fu
Zhenyu Dai Zening Yang Junjie Lai Miao Yu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Smart Materials and Structures, novembre 2019, n. 1, v. 29 |
Page(s): | 014001 |
DOI: | 10.1088/1361-665x/ab3cfa |
- Informations
sur cette fiche - Reference-ID
10364831 - Publié(e) le:
21.08.2019 - Modifié(e) le:
05.12.2019