Thermal Integration of Postcombustion CO2 Capture in Existing Natural Gas Combined Cycle–Combined Heat and Power Plant
Auteur(s): |
Zhongyuan Huang
(Dept. of Municipal and Environmental Engineering, Beijing Jiaotong Univ., Beijing 100044, China.)
Jin Li (Dept. of Municipal and Environmental Engineering, Beijing Jiaotong Univ., Beijing 100044, China (corresponding author).) Chaowen Jing (Dept. of Municipal and Environmental Engineering, Beijing Jiaotong Univ., Beijing 100044, China.) Hongguang An (Datang International Power Generation Co., Ltd., No. 9 Guangningbo St., Beijing 100033, China.) Yiying Tong (Datang International Power Generation Co., Ltd., No. 9 Guangningbo St., Beijing 100033, China.) Baodong Xie (Datang International Power Generation Co., Ltd., No. 9 Guangningbo St., Beijing 100033, China.) Ying Zhao (Datang International Power Generation Co., Ltd., No. 9 Guangningbo St., Beijing 100033, China.) Changzhu Li (Datang International Power Generation Co., Ltd., No. 9 Guangningbo St., Beijing 100033, China.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Energy Engineering, octobre 2017, n. 5, v. 143 |
Page(s): | 04017025 |
DOI: | 10.1061/(asce)ey.1943-7897.0000455 |
- Informations
sur cette fiche - Reference-ID
10588532 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021