비용구조분석에 의한 건축단계별 공사비용 절감방법 (The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure)
Auteur(s): |
Keun-Joon Park
|
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), mars 2005, n. 1, v. 5 |
Page(s): | 97-103 |
DOI: | 10.5345/jkic.2005.5.1.097 |
- Informations
sur cette fiche - Reference-ID
10762308 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024