Testing of a temporary railway bridge and analysis of the results

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Materials Science and Engineering, , n. 1, v. 1297
Page(s): 012003
DOI: 10.1088/1757-899x/1297/1/012003
Abstrait:

The main purpose of bridge testing, an obligatory step before putting a railway bridge in operation, is to ensure that the used theoretical model is in accordance with the actual behaviour of the structure. Furthermore, bridge testing can point to some problems or inaccuracies due to construction.

Even though temporary bridges typically have shorter spans, they have relatively low self-weight and the main strains are caused by live loads. Therefore, bridge testing is particularly important to ensure the proper performance of such structures.

This paper outlines some major steps of the testing process and draws conclusions based on a temporary railway bridge located along the Kalotina Highway in Bulgaria.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1757-899x/1297/1/012003.
  • Informations
    sur cette fiche
  • Reference-ID
    10777306
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine