Terminus, Vancouver Island: solving a mass timber challenge in a seismic region
Auteur(s): |
Brendan Fitzgerald
Ilana Danzig Ross Jardine Mehrdad Jahangiri |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | The Structural Engineer, avril 2022, n. 4, v. 100 |
Page(s): | 30-34 |
DOI: | 10.56330/bozx8886 |
Abstrait: |
This article describes the design and construction of a five-storey commercial building featuring a novel steel buckling-restrained brace lateral system framed within its mass timber superstructure. |
- Informations
sur cette fiche - Reference-ID
10762676 - Publié(e) le:
23.03.2024 - Modifié(e) le:
23.03.2024