Temporary Works Toolkit. Part 8: Modular hydraulic propping systems for deep excavations
Auteur(s): |
Tony Gould
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | The Structural Engineer, février 2017, n. 2, v. 95 |
Page(s): | 32-34 |
DOI: | 10.56330/xtqq7150 |
Abstrait: |
This article explores temporary works in relations to deep excavations, and the various challenges that come with it. |
- Informations
sur cette fiche - Reference-ID
10763051 - Publié(e) le:
23.03.2024 - Modifié(e) le:
23.03.2024