Temporary Works Toolkit. Part 14: Lifting, moving and jacking
Auteur(s): |
Jim Tod
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | The Structural Engineer, août 2017, n. 8, v. 95 |
Page(s): | 26-32 |
DOI: | 10.56330/xtxf5863 |
Abstrait: |
This article provides a brief introduction to some of the construction techniques of lifting, moving and jacking that may be needed to build more challenging permanent works. |
- Informations
sur cette fiche - Reference-ID
10763000 - Publié(e) le:
23.03.2024 - Modifié(e) le:
23.03.2024