0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Technical Challenges During Construction of Alborz Service Tunnel, Iran

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Geomechanik und Tunnelbau, , n. 6, v. 1
Page(s): 537-542
DOI: 10.1002/geot.200800065
Abstrait:

The Tehran Shomal Motorway project is one the major infrastructure projects currently ongoing in Iran. The line will connect the capital of Iran, Tehran with the Caspian Sea. The traffic volume is very high and the conditions of the actual roads, especially in the winter and holiday times are dangerous. The Alborz tunnel system, with the actual ongoing excavation of its service tunnel, is the outstanding lot of the Tehran Shomal Motorway project. The project is facing severe and adverse geological conditions like various dangerous gases, water and material inrush and blocked TBM. Depending on the conditions at the remaining length the breakthrough is anticipated by early 2009.

Disponible chez: Voir chez l'éditeur
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1002/geot.200800065.
  • Informations
    sur cette fiche
  • Reference-ID
    10031995
  • Publié(e) le:
    20.01.2009
  • Modifié(e) le:
    15.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine