'쉴드TBM터널에서 뒤채움 주입이 지반의 단기·장기 침하에 미치는 영향에 대한 수치해석적 연구 (Study on the effect of tail void grouting on the short- and long-term surface settlement in the shield TBM Tunneling using numerical analysis)
Auteur(s): |
Ju-Young Oh
Hyunku Park Dohyoung Kim Seokbue Chang Seungbok Lee Hangseok Choi |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), mars 2017, n. 2, v. 19 |
Page(s): | 265-281 |
DOI: | 10.9711/ktaj.2017.19.2.265 |
- Informations
sur cette fiche - Reference-ID
10394687 - Publié(e) le:
26.11.2019 - Modifié(e) le:
02.12.2020