Tasks and Problems in the Buildings Demolition Works: A Case Study
Auteur(s): |
A. Sobotka
A. Radziejowska J. Czaja |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Archives of Civil Engineering, décembre 2015, n. 4, v. 61 |
Page(s): | 3-18 |
DOI: | 10.1515/ace-2015-0032 |
Abstrait: |
In Poland, it often happens that construction objects are subject to demolition work for different reasons. Demolition, according the Construction Law, is defined as a type of construction works and, as such, represents a particular type of construction project. As in other construction projects, a very important phase, in addition to execution of the works, is to prepare, design and plan demolition works. Some demolition activities are covered by appropriate regulations and can be described as typical. On the other hand the technical side of demolition works depends on many factors such as: the type of building, its age, technical condition, type of construction, etc. This article covers the analysis of the stages and tasks in the preparatory phase of the building demolition. This work will also present a description of the tasks carried out during the demolition works based on the example of a historic tenement house located in Krakow. This analysis aims to identify implementation problems and sources of risk that may occur during this type of construction work. |
- Informations
sur cette fiche - Reference-ID
10476885 - Publié(e) le:
25.11.2020 - Modifié(e) le:
25.11.2020