Synchronous-cross zoned excavation of the oversized basement of Shanghai International Financial Centre by combination of bottom-up and top-down methods: Structural and geotechnical behaviors
Auteur(s): |
Yong Tan
Ye Lu Dalong Wang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, novembre 2024, v. 153 |
Page(s): | 106023 |
DOI: | 10.1016/j.tust.2024.106023 |
- Informations
sur cette fiche - Reference-ID
10791838 - Publié(e) le:
01.09.2024 - Modifié(e) le:
01.09.2024