Auteur(s): |
John Tingerthal
Faz Ehsan |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Civil Engineering Magazine, février 2005, n. 2, v. 75 |
Page(s): | 36-45 |
DOI: | 10.1061/ciegag.0000008 |
Abstrait: |
The design and construction of a new performance hall in Madison, Wisconsin, that incorporated elements of existing structures, met demanding acoustical requirements, and was completed on a fast-track schedule required intensely concerted coordination among practitioners in many disciplines. |
- Informations
sur cette fiche - Reference-ID
10020238 - Publié(e) le:
23.07.2005 - Modifié(e) le:
01.12.2018