0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Study on Optimization of Cooling System for Mass Pier Column of Shenzhong Passage Non-navigable Bridge

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Physics: Conference Series, , n. 1, v. 2476
Page(s): 012017
DOI: 10.1088/1742-6596/2476/1/012017
Abstrait:

In this paper, the optimization layout of cooling pipes and the measured temperature field of the mass pier column for the Shenzhong Passage non-navigable bridge are carried out, and the finite element modeling software is utilized to simulate the whole construction process, and the temperature time and process model is established for simulation analysis. The results show that the measured hydration heat temperature field in the field construction meets good agreement with the simulation results. The optimized cooling pipe layout scheme saves more raw materials and elbows, and shorts the project construction period; It can realize more effective internal lowering and external protection for the construction of mass concrete structures of piers and columns, which is especially suitable for the maintenance of sea-crossing bridges in windy environmental conditions; The temperature-induced cracks are effectively controlled, which can provide a reference for similar projects.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1742-6596/2476/1/012017.
  • Informations
    sur cette fiche
  • Reference-ID
    10777585
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine