A semicontinuous process system consisting of a single-bucket excavator, truck, crushing station, and belt conveyor is the main coal mining process system of a large-scale hard coal open-pit mine. Through analyzing the coal mining production process, the key issues of coal mining truck flow optimization are obtained. Statistical method of using triangular fuzzy numbers analyzes the key time parameters of coal mining truck flow. Taking one shift, the minimum expected value of number of trucks, as the objective function, the fuzzy expectation of the coal mining semicontinuous process system is established with the constraints of the truck flow continuity at the loading and unloading point, the production capacity of the electric shovel, the production capacity of the crushing station, coal quality, and coal mining production tasks. The truck flow planning model is solved using particle swarm intelligence algorithm. The simulation results show that the result of truck flow planning can effectively reduce truck number, truck dispatching number, transportation costs, and truck queuing. The fuzzy expected truck flow planning model established by the study is suitable for solving the problem of optimizing and matching the production capacity in the process which links electric shovel, truck, and crushing station. It can effectively improve the production efficiency of electric shovel mining, truck transportation, and crushing station.

Copyright: © 2020 Haiming Bao and Ruixin Zhang et al.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10426566
  • Publié(e) le:
    13.07.2020
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine