Stochastic time series forecasting of electricity costs in an NHS acute care hospital building, for use in whole life cycle costing
Auteur(s): |
Richard J. Kirkham
A. Halim Boussabaine Matthew P. Kirkham |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, janvier 2002, n. 1, v. 9 |
Page(s): | 38-52 |
DOI: | 10.1108/eb021205 |
- Informations
sur cette fiche - Reference-ID
10575859 - Publié(e) le:
26.02.2021 - Modifié(e) le:
26.02.2021