0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

A specialist partnership frustrated: Utzon and Symonds at Sydney

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: arq: Architectural Research Quarterly, , n. 2, v. 3
Page(s): 165-174
DOI: 10.1017/s1359135500001949
Abstrait:

The resignation of the Sydney Opera House architect, Jørn Utzon, marked the culmination of an increasingly frustrating phase of the project. Utzon had intended a partnership between designer, consultant, contractor and subcontractor to develop technical design solutions which would not have been possible under normal competitive tendering. The government rejected this. Here are examined the issues which underpinned the relationship between the architect seeking technical perfection and the manufacturing engineer seeking the fullest artistic expression of his product.

Lieux géographiques

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1017/s1359135500001949.
  • Informations
    sur cette fiche
  • Reference-ID
    10362669
  • Publié(e) le:
    12.08.2019
  • Modifié(e) le:
    12.08.2019
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine