Some Practical Aspects of Column Base Selection
Auteur(s): |
David T. Ricker
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering Journal, septembre 1989, n. 3, v. 26 |
Page(s): | 81-89 |
DOI: | 10.62913/engj.v26i3.526 |
Abstrait: |
The following three methods can be used effectively to prepare a landing site for the erection of a column: Leveling plates, Leveling nuts and Preset base plates. |
- Informations
sur cette fiche - Reference-ID
10783007 - Publié(e) le:
17.05.2024 - Modifié(e) le:
17.05.2024