0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Engineering Journal, , n. 3, v. 27
Page(s): 114-120
DOI: 10.62913/engj.v27i3.550
Abstrait:

The concept of prestressed steel flexural members was extensively studied in the 1960s1; however, the actual use of such members for bridge construction is a recent development in the United States. The recently completed Bonners Ferry Bridge in Idaho and the Muddy Boggy River Bridge in Oklahoma are two examples of cable-stressed plate girder bridges. The INVERSET system of fabricating small river crossing bridges, which is gaining wide use in Oklahoma and other southern states, is another example of prestressed-steel bridge construction. The principal advantage of prestressing is, of course, a reduction in material quantities needed. Non-composite, composite and prestressed optimized designs are compared. The advantages of prestressing are obvious. This paper reviews the available methods for prestressed steel concrete slab bridge construction, discusses advantages and disadvantages of the method of construction, and presents some test results concerning shrinkage, creep and fatigue of a prestressed-steel concrete slab bridge unit.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.62913/engj.v27i3.550.
  • Informations
    sur cette fiche
  • Reference-ID
    10782970
  • Publié(e) le:
    17.05.2024
  • Modifié(e) le:
    17.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine