Shallow-buried subway station construction period: Comparison of intelligent early warning and optimization strategies for surface deformation risk
Auteur(s): |
Dukun Zhao
Jiwen Bai Xin Chen Hongzhao Li Yueji He Qingsong Zhang Rentai Liu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, novembre 2024, v. 153 |
Page(s): | 105978 |
DOI: | 10.1016/j.tust.2024.105978 |
- Informations
sur cette fiche - Reference-ID
10791940 - Publié(e) le:
01.09.2024 - Modifié(e) le:
01.09.2024