Selection of Construction Bidders Using the Analytical Hierarchy Process and Friedman Theory
Auteur(s): |
Alaa Salman
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Frontiers in Built Environment, janvier 2021, v. 7 |
DOI: | 10.3389/fbuil.2021.815022 |
Abstrait: |
Selecting a suitable bidder to execute a construction project is not an easy task, especially for the short bidder list. The consequences of the selection might affect the project performance in terms of cost, money, and quality. The current research in this work deals with the selection of a contractor, who bids on a specific project. The historical data of contractors are a key of the selection based on three approaches: the quick selection approach (QSA), generic selection approach (GSA), and comprehensive selection approach (CSA). The QSA relies on the scoring system according to delay factors. The QSA is the weighted average of the delay factors using the analytical hierarchy process (AHP), the CSA is based on the integrated QSA and the bidding strategy using Friedman’s theory. The current three approaches can be utilized by public and private owners, who intend to select a general contractor to execute new construction projects. A hypothetical case study is implemented to demonstrate the developed models. Several experts in the field of construction management have confirmed the findings. The third strategy (CSA) is found to be the most appropriate for selecting construction bidders. |
Copyright: | © 2021 Alaa Salman, |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
1.15 MB
- Informations
sur cette fiche - Reference-ID
10658849 - Publié(e) le:
17.02.2022 - Modifié(e) le:
01.06.2022