Seismic performance assessment of a base-isolated hospital building subjected to February 6, 2023, Kahramanmaraş, Türkiye earthquakes (Mw 7.7 Pazarcık and Mw 7.6 Elbistan) and seismic fragility analysis considering different construction stages
Auteur(s): |
Furkan Şen
Fezayil Sunca Ahmet Can Altunişik |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Soil Dynamics and Earthquake Engineering, octobre 2024, v. 185 |
Page(s): | 108876 |
DOI: | 10.1016/j.soildyn.2024.108876 |
- Informations
sur cette fiche - Reference-ID
10794865 - Publié(e) le:
01.09.2024 - Modifié(e) le:
01.09.2024