운영중인 도로터널의 측벽하부 숏크리트 보강에 의한 단면확대 (Section enlargement by reinforcement of shotcrete lining on the side wall of operating road tunnel)
Auteur(s): |
Dong-Gyou Kim
Young-Wan Shin Young-Suk Shin |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), 30 novembre 2012, n. 6, v. 14 |
Page(s): | 637-652 |
DOI: | 10.9711/ktaj.2012.14.6.637 |
- Informations
sur cette fiche - Reference-ID
10394884 - Publié(e) le:
26.11.2019 - Modifié(e) le:
26.11.2019