Schedule Risk Analysis for TBM Tunneling Based on Adaptive CYCLONE Simulation in a Geologic Uncertainty–Aware Context
Auteur(s): |
Donghai Liu
Peng Xuan Shuai Li Peizhi Huang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Computing in Civil Engineering, novembre 2015, n. 6, v. 29 |
Page(s): | 04014103 |
DOI: | 10.1061/(asce)cp.1943-5487.0000441 |
- Informations
sur cette fiche - Reference-ID
10258957 - Publié(e) le:
29.12.2018 - Modifié(e) le:
29.12.2018