Schedule and Cost Control in Dwelling Construction Using Control Charts

Auteur(s):



Médium: article de revue
Langue(s): anglais
Publié dans: The Open Construction and Building Technology Journal, , n. 1, v. 8
Page(s): 63-79
DOI: 10.2174/1874836801408010063
Abstrait:

Methods to monitor the schedule and to control cost in dwelling construction projects are numerous and varied but commonly constitute an obstacle to a fast and agile response by construction managers, whose decisions require information to be comprehensive and summarized. A simple model to monitor these projects is proposed that can easily be implemented within control systems that are already in place. For the first time, process control charts are combined with cost control in dwelling construction in order to prevent overruns in terms of time and/or cost. The model facilitates the production supervision of construction contracts by regularly providing information on the work completed and the incurred cost of the production processes per period, through charting and/or summarizing this information in a manner consistent with statistical control charts. Finally, the manager can easily identify those processes which are off target by consulting control charts.

Copyright: © 2014 Madelyn Marrero, Antonio Fonseca, Raúl Falcon, Antonio Ramirez-de-Arellano
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10384617
  • Publié(e) le:
    23.11.2019
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine