Auteur(s): |
Oscar A. Khoury
George S. Freiha Charlene K. Dennis Jim Lumm Kelly Sunderland |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Civil Engineering Magazine, février 2003, n. 2, v. 73 |
Abstrait: |
The city of San Diego used the design/build method to add two large-diameter pipelines -- one for potable water and the other for reclaimed water -- to its overburdened water delivery system. The method shortened the project's delivery time by several months. |