0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Geomechanik und Tunnelbau, , n. 5, v. 1
Page(s): 486-490
DOI: 10.1002/geot.200800038
Abstrait:

The Silver Line Phase II in Boston, USA, (Logan Airport to South Station) includes the crossing of the Russia Wharf, a 100 year old, three building complex, each seven stories high. The first use of ground freezing and NATM in the US enabled these office buildings to stay fully operational and minimized the impacts on the tenants and these old structures while tunnelling underneath. Mitigation of settlements included temporary and permanent underpinning, raising and lowering of building columns and facades and the use of ground freezing which also created stable face conditions for the NATM mining operation only a few feet below surface.

Disponible chez: Voir chez l'éditeur
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1002/geot.200800038.
  • Informations
    sur cette fiche
  • Reference-ID
    10031986
  • Publié(e) le:
    20.01.2009
  • Modifié(e) le:
    15.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine