The role of formal and informal mechanisms in implementing lean principles in construction projects
Auteur(s): |
Lena Elisabeth Bygballe
Maria Endresen Silje Fålun |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, novembre 2018, n. 10, v. 25 |
Page(s): | 1322-1338 |
DOI: | 10.1108/ecam-07-2017-0138 |
Abstrait: |
PurposePrevious research shows that implementing lean construction is not a straightforward task. The purpose of this paper is to examine the role of formal and informal mechanisms in implementing lean principles in construction projects. Design/methodology/approachThe paper draws on a single case study of the implementation of innovative lean principles in a public construction project in Norway. The study is based on qualitative data, including 17 semi-structured interviews with 21 individuals, document analysis, and observations in meetings and seminars, in addition to informal conversations. FindingsFormal mechanisms, including contractual arrangements, have the potential to both facilitate and hamper the implementation of innovative lean principles in a construction project. They might create coherence, but at the same time they might limit the scope of the concept in such a way that others do not accept it. Informal mechanisms, including social and lateral relationships and trust aid implementation, both directly by creating commitment and by modifying the challenges that the formal mechanisms potentially incur. Formal mechanisms may, in turn, nurture the informal ones. Research limitations/implicationsThe research is based on a single case study within the Norwegian public sector, which is dependent on specific public procurement regulations and subject to strong contractual traditions. Originality/valueThe research extends the existing knowledge of implementation of lean construction in the construction industry. It helps refining the understanding of the role played by formal and informal mechanisms, and the interplay between them in the implementation process. This knowledge is also relevant for process innovations in construction in general. |
- Informations
sur cette fiche - Reference-ID
10576689 - Publié(e) le:
26.02.2021 - Modifié(e) le:
26.02.2021