Robustness Analysis of Total Project Cost and Schedule Delay and Overrun Indicators of Heavy Industrial Projects
Auteur(s): |
Sharareh Kermanshachi
Apurva Pamidimukkala |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, mai 2023, n. 2, v. 15 |
DOI: | 10.1061/jladah.ladr-942 |
- Informations
sur cette fiche - Reference-ID
10715612 - Publié(e) le:
21.03.2023 - Modifié(e) le:
21.03.2023