0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s): ORCID

ORCID


Médium: article de revue
Langue(s): anglais
Publié dans: Infrastructures, , n. 6, v. 7
Page(s): 81
DOI: 10.3390/infrastructures7060081
Abstrait:

The development of transport infrastructure is associated with risks, expressed in the likelihood of harm to the road users’ health during road accidents and their consequences. The risk management process is aimed at reducing the influence of factors that contribute to the occurrence of an accident and increase the consequences’ severity after it. This article proposes a risk management methodology within five stages: identification, analysis and evaluation, processing, development of recommendations, and monitoring. For each step, we describe the methods and models that allow us to effectively solve the problem of risk management. We proposed a risk management algorithm based on feedback. We tested the adequacy of the methodology on a specific example: we conducted an analysis, an assessment, and proposed risk management measures in the field of ensuring road safety in a small town.

Copyright: © 2022 the Authors. Licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10722862
  • Publié(e) le:
    22.04.2023
  • Modifié(e) le:
    10.05.2023
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine