Risk Control Method and Practice in the Whole Construction Process of a Shield Tunneling Pipe Gallery in Complex Surrounding Underground Environment
Auteur(s): |
Liuqun Dong
Jiming Cao Xian Liu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, septembre 2022, n. 3, v. 8 |
DOI: | 10.1061/ajrua6.0001260 |
- Informations
sur cette fiche - Reference-ID
10689600 - Publié(e) le:
13.08.2022 - Modifié(e) le:
13.08.2022