Risk-Based Priority Setting for Large-Scale Access Management Programs with Uncertain Mobility Benefits and Costs
Auteur(s): |
Marwan Alsultan
Zachary A. Collier James H. Lambert |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, mars 2021, n. 1, v. 7 |
Page(s): | 04020046 |
DOI: | 10.1061/ajrua6.0001094 |
- Informations
sur cette fiche - Reference-ID
10519269 - Publié(e) le:
10.12.2020 - Modifié(e) le:
19.02.2021