Risk Assessment of Tunnel Portals in the Construction Stage Based on Fuzzy Analytic Hierarchy Process
Auteur(s): |
Xianghui Deng
Rui Wang Tian Xu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Archives of Civil Engineering, décembre 2018, n. 4, v. 64 |
Page(s): | 69-87 |
DOI: | 10.2478/ace-2018-0045 |
Abstrait: |
This study presents a fuzzy analytic hierarchy process (FAHP) by integrating analytic hierarchy process (AHP) and fuzzy cognition to evaluate the construction risks of tunnel portals. Wuguanyi Tunnel is taken as the research objective to validate the performance of the proposed method. The result shows that the proposed decision making method can effectively identify risk factors and determine the risk level during the construction of tunnel portals. Finally, the corresponding control measures during the construction of the Wuguanyi Tunnel portal are proposed according to the risk assessment results. |
- Informations
sur cette fiche - Reference-ID
10476710 - Publié(e) le:
25.11.2020 - Modifié(e) le:
25.11.2020