0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Risk Assessment of Tunnel Portals in the Construction Stage Based on Fuzzy Analytic Hierarchy Process

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Archives of Civil Engineering, , n. 4, v. 64
Page(s): 69-87
DOI: 10.2478/ace-2018-0045
Abstrait:

This study presents a fuzzy analytic hierarchy process (FAHP) by integrating analytic hierarchy process (AHP) and fuzzy cognition to evaluate the construction risks of tunnel portals. Wuguanyi Tunnel is taken as the research objective to validate the performance of the proposed method. The result shows that the proposed decision making method can effectively identify risk factors and determine the risk level during the construction of tunnel portals. Finally, the corresponding control measures during the construction of the Wuguanyi Tunnel portal are proposed according to the risk assessment results.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.2478/ace-2018-0045.
  • Informations
    sur cette fiche
  • Reference-ID
    10476710
  • Publié(e) le:
    25.11.2020
  • Modifié(e) le:
    25.11.2020
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine