Risk Assessment and Early-Warning System for High-Speed Railway during the Construction and Operation of Underpass Bridges
Auteur(s): |
Wei He
Yinlong Duan Liwen Deng Weiguang Zhou |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Performance of Constructed Facilities (ASCE), février 2016, n. 1, v. 30 |
Page(s): | C4015003 |
DOI: | 10.1061/(asce)cf.1943-5509.0000717 |
Types d'ouvrages
- Informations
sur cette fiche - Reference-ID
10192593 - Publié(e) le:
02.12.2018 - Modifié(e) le:
02.12.2018