Abstrait:

Existing analyses of the February 2017 Oroville Dam Crisis identify maintenance failures and engineering shortcomings as the root cause of a nearly catastrophic failure of the tallest dam in the United States. However, the focus on technical shortcomings largely overlooks the role of adaptive decision-making that eventually averted the crisis. Understanding the decisions that both created the circumstances leading up to the crisis and saved the dam from collapse requires that risk analysis be complemented by a resilience perspective. This paper presents a case study on the Oroville Dam Crisis to develop a timeline of failures and successes in the resilience processes of sensing, anticipation, adapting, and learning throughout the history of the dam. Three factors that drove poor operational and engineering decisions include: (1) misalignment of technical nomenclature and design requirements for the ungated spillway, (2) overconfidence in original engineering designs, and (3) conflicting pressure from diverse stakeholders. These factors contributed to unrealistic perceptions of dam capabilities and promoted decisions to forgo maintenance and design efforts that may have mitigated the danger.

License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10723327
  • Publié(e) le:
    22.04.2023
  • Modifié(e) le:
    10.05.2023
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine