Risk Analysis of Tunnel Construction Scheme Change based on Field Monitoring and Numerical Analysis
Auteur(s): |
Zhanping Song
Wanying Su Xiaoxu Tian Yuwei Zhang GuanNan Zhou |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Advances in Civil Engineering, janvier 2021, v. 2021 |
Page(s): | 1-15 |
DOI: | 10.1155/2021/8888886 |
Abstrait: |
Because of the surrounding environment restriction, some sections of the Lanzhou Metro Line 2 were forced to change the original open excavation method to the concealed excavation method. Among them, the ingate is the transitional section connecting the shaft and the cross passage, which is accompanied by the force conversion of the structure during the plan change process, and accidents are prone to occur. Combining this project situation, a construction scheme for turning the shaft from the cross passage into the ingate of mine line was proposed, and the finite element software is used to simulate the scheme. Numerical analysis shows that the stability of the tunnel supporting structure, shaft, and cross passage all meet the design requirements. The final ground settlement caused by the proposed construction method is 7.1 mm, and the settlement of the vault is 11.97 mm. It also turns out that the proposed construction method causes less deformation, and the method can be applied to the construction of the ingate conversion. The rationality of the method and numerical model was further verified by the comparison between the monitored data of surface settlement and vault sinking and numerical simulation results. Finally, the modified concealed excavation method and the original open excavation construction method is compared. It is concluded that the concealed excavation method is superior to the original open excavation method in terms of construction schedule, construction safety, economic benefits, and impact of construction on the surrounding environment. It indicates that it is a good choice to replace the construction method early if necessary. The successful implementation of this project can provide a reference for the design and implementation of similar urban subway projects. |
Copyright: | © 2021 Zhanping Song et al. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
6.87 MB
- Informations
sur cette fiche - Reference-ID
10578367 - Publié(e) le:
02.03.2021 - Modifié(e) le:
02.06.2021