0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Retrofitting a Short Span Bridge with a Semi-Integral Abutment Bridge: The Treviso Bridge

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 2, v. 19
Page(s): 137-141
DOI: 10.2749/101686609788220051
Abstrait:

There are a number of bridges which are designed according to codes without seismic provisions being considered. Such bridges are mostly found deficient and may need seismic retrofitting. Bridges that were built before the 1970s, either in the USA or Japan or Europe, were designed with little or no consideration for seismic demands. The majority of these bridges are supported on reinforced concrete bents at the abutments and pier walls that lack the ductility and strength to resist earthquakes. Besides most of these bridges have short spans (6–18 m) to medium spans (18–90 m). A bridge with a short span may be built with timber girders or with a concrete slab superstructure, whereas a bridge with a medium span is often built with steel girders, precast concrete girders, or cast-in-place box girders. Bridges in general consist of two structural components: a superstructure including the elements above the support and a substructure including the elements that sustain the superstructure. In this paper, the retrofitting of an existing short bridge is discussed; it is situated in Treviso (a town in the Venice area) near the vital new airport "Antonio Canova". Retrofit consists of building a new semi-integral bridge type with micro-piers on the bridge heads.

Types d'ouvrages

  • Informations
    sur cette fiche
  • Reference-ID
    10048674
  • Publié(e) le:
    08.12.2009
  • Modifié(e) le:
    13.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine