Resource-constrained scheduling for continuous repetitive projects with time-based production units
Auteur(s): |
Machine Hsie
Ching-Jung Chang I-Tung Yang Chun-Yen Huang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, novembre 2009, n. 7, v. 18 |
Page(s): | 942-949 |
DOI: | 10.1016/j.autcon.2009.04.006 |