0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Resistance Analysis of Open Caisson Towing on Water in the Construction of the Large Scale Bridge

Auteur(s):



Médium: article de revue
Langue(s): anglais
Publié dans: The Open Construction and Building Technology Journal, , n. 1, v. 8
Page(s): 433-438
DOI: 10.2174/1874836801408010433
Abstrait:

In order to solve the towing problem on water of the open caisson in the construction of the large scale bridge efficiently, combining with the towing operation project, the dragged open caisson and environmental data, etc. we design and produce the open caisson physical model and configure the test environment, use the force cell to collect real-time experimental data, analyze and demonstrate the towing resistance of the open caisson. Use the experimental data and the model of resistance similarity transformation to calculate the resistance, while the towing speed is 1m/s, 2m/s and 3m/s, the resistance is 323 KN, 724KN, 1398KN in the straight test mode and the resistance is 365 KN, 861KN, 2326KN in the transverse test mode. The results show that the resistance of the open caisson has certain growth trend with the towing speed rising, which both have large correlation, and the resistance of transverse situation is larger than straight mode.

Copyright: © 2014 Yang XiaoJun, Chen Liang, Zhou Wei, Xiao Yingjie
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10384221
  • Publié(e) le:
    23.11.2019
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine