Research on Influence of Pile-arch Conversion Structure on Existing Tunnel
Auteur(s): |
Zhiheng Deng
Xiliang Gao Menggen Yang Feiyue Yan Xingxin Qi Wenge Qiu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | IOP Conference Series: Materials Science and Engineering, 1 janvier 2020, n. 1, v. 741 |
Page(s): | 012085 |
DOI: | 10.1088/1757-899x/741/1/012085 |
Abstrait: |
Based on the actual project of Chongqing North Station project, this paper uses the software Flac3D to construct the excavation conditions of the foundation pit near the tunnel. A pile-arch conversion structure was applied above the tunnel. By examining the stress and axial force of the tunnel and calculating its safety factor, the advantages of the arch structure over the flat beam were explained, providing guidance and reference for similar projects in the future. |
- Informations
sur cette fiche - Reference-ID
10675403 - Publié(e) le:
12.06.2022 - Modifié(e) le:
12.06.2022