Required separation distance between decks and at abutments of a bridge crossing a canyon site to avoid seismic pounding
Auteur(s): |
Kaiming Bi
Hong Hao Nawawi Chouw |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Earthquake Engineering and Structural Dynamics, mars 2010, n. 3, v. 39 |
DOI: | 10.1002/eqe.943 |
- Informations
sur cette fiche - Reference-ID
10330487 - Publié(e) le:
28.07.2019 - Modifié(e) le:
08.05.2021