0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Renovation process challenges and barriers: addressing the communication and coordination bottlenecks in the zero-energy building renovation workflow in European residential buildings

Auteur(s): ORCID (Architectural Facades & Products Research Group, Department of Architectural Engineering + Technology, Faculty of Architecture and the Built Environment, Delft University of Technology, Delft, The Netherlands)
ORCID (Architectural Facades & Products Research Group, Department of Architectural Engineering + Technology, Faculty of Architecture and the Built Environment, Delft University of Technology, Delft, The Netherlands)
ORCID (Architectural Facades & Products Research Group, Department of Architectural Engineering + Technology, Faculty of Architecture and the Built Environment, Delft University of Technology, Delft, The Netherlands)
Médium: article de revue
Langue(s): anglais
Publié dans: Architectural Science Review, , n. 3, v. 67
Page(s): 1-13
DOI: 10.1080/00038628.2023.2214520
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1080/00038628.2023.2214520.
  • Informations
    sur cette fiche
  • Reference-ID
    10729070
  • Publié(e) le:
    30.05.2023
  • Modifié(e) le:
    24.04.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine