Reliable design of an integrated forward-revere logistics network under uncertainty and facility disruptions: A fuzzy possibilistic programing model
Auteur(s): |
S. M. Hatefi
F. Jolai S. A. Torabi R. Tavakkoli-Moghaddam |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | KSCE Journal of Civil Engineering, février 2015, n. 4, v. 19 |
Page(s): | 1117-1128 |
DOI: | 10.1007/s12205-013-0340-y |
- Informations
sur cette fiche - Reference-ID
10172719 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018