0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 4, v. 10
Page(s): 254-258
DOI: 10.2749/101686600780481374
Abstrait:

The structural rehabilitation of the Sidi M'Cid suspension bridge in Constantine, Algeria, is presented. The bridge, designed by Arnodin in 1908 has a main span of 160 m and a mixed cable-supporting system with a stayed deck portion near the towers. Over time various components of the bridge had corroded, calling for structural rehabilitation that included partial replacement of the main suspension system as well as major interventions on both anchorages. Because the bridge spans a canyon 200 m deep, specifically designed equipment was required in order to partially replace the suspension system while maintaining the bridge under full service.

Ouvrages et projets

Types d'ouvrages

Lieux géographiques

  • Informations
    sur cette fiche
  • Reference-ID
    10003273
  • Publié(e) le:
    15.09.2002
  • Modifié(e) le:
    03.11.2018
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine