Rapid Replacement of a Damaged Expressway Bridge in Two Weeks
Auteur(s): |
Kyosuke Kato
(Deputy Manager, Renewal Project Management Division, Renewal and Construction Department, Metropolitan Expressway Co., Ltd, Tokyo, Japan. Contact:)
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structural Engineering International |
Page(s): | 1-5 |
DOI: | 10.1080/10168664.2024.2398794 |
- Informations
sur cette fiche - Reference-ID
10798756 - Publié(e) le:
23.09.2024 - Modifié(e) le:
23.09.2024