Raising expectations: a cantilever bridge becomes a cable-stayed crossing
Auteur(s): |
Jan Teigen
Steinar Fjeldheim |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Bridge Design & Engineering, 1er trimestre 2003, n. 30, v. 9 |
Page(s): | 31-32 |