0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Project Time, Cost and Quality Constraints Management Through Structured Fuzzy Mapping on Psychological Phenomena

Auteur(s): ORCID
ORCID

ORCID
ORCID
ORCID
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Civil Engineering and Management, , n. 8, v. 29
Page(s): 669-690
DOI: 10.3846/jcem.2023.19212
Abstrait:

Construction business involves people from different employers who have to work together in one project, thus a project manager needs to apply scientific principles to understand and to utilize those common psychological phenomena such as Hedgehog Effect, Butterfly Effect, Pygmalion Effect, Boiled Frog Syndrome, Parkinson’s Law, and Bandwagon Effect in completing work well and keeping people satisfied. The aim of this study is to develop a fuzzy mapping to assist project managers in implementing significant psychological phenomena in construction management through reflections on common psychological phenomena in the construction management. Through a structured interview survey among construction managers, the inferential association among gender, working experience, and the six psychological phenomena were plotted based on the Partial Least Square Structural Equation Modelling. Through the pairwise comparison technique, a fuzzy mapping of psychological phenomena in time, cost, and quality management was developed to facilitate the managerial efficiency in construction.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.3846/jcem.2023.19212.
  • Informations
    sur cette fiche
  • Reference-ID
    10744794
  • Publié(e) le:
    28.10.2023
  • Modifié(e) le:
    28.10.2023
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine