Project managers’ perception of production problems — An Indonesian case study
Lack of material was considered of most importance to productivity problems whilst re‐work was equally a problem under kendall concordance analysis
Auteur(s): |
Peter F. Kaming
Paul O. Olomolaiye Gary D. Holt Simon T. Kometa Frank C. Harris |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Building Research & Information, 1996, n. 5, v. 24 |
Page(s): | 302-310 |