Project management processes in the adoption of smart building technologies: a systematic review of constraints
Auteur(s): |
Frank Ato Ghansah
De-Graft Owusu-Manu Joshua Ayarkwa |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Smart and Sustainable Built Environment, juillet 2020, n. 2, v. 10 |
Page(s): | 208-226 |
DOI: | 10.1108/sasbe-12-2019-0161 |
Abstrait: |
PurposeThe necessity for sustainable development and high building performance has led to the adoption of smart building technologies (SBTs) in the construction community. The SBTs adoption has been hindered in many different parts of the world due to several constraints underpinning the project management processes to help adopt SBTs. This paper presents a systematic review of relevant literature on barriers underpinning the project management processes on the adoption of SBTs. Design/methodology/approachThis paper presents a systematic review of relevant literature on barriers to technology adoption published in academic peer-reviewed journals and conference papers. The study adopted a systematic review technique on 56 relevant articles and conference papers in relation to barriers to adoption of technology, and barrier frequency was employed to select the most reported barriers. FindingsThe study revealed the most reported barriers underpinning project management process towards SBTs adoption, which include lengthy approval process for new SBTs, structure and organization of the construction industry, higher cost for smart construction practices and materials, unfamiliarity with smart building technology and technical difficulty during construction process. Practical implicationsTo both the industry practitioners and policymakers, this review provides a valuable reference during implementation. Also, to the academic scholars on embarking on further empirical studies, the developed checklist of SBTs barriers could be important and useful. Originality/valueThis study has contributed to the knowledge of barriers underpinning the project management processes on SBTs adoption by identifying the most reported barriers in literature. |
- Informations
sur cette fiche - Reference-ID
10779836 - Publié(e) le:
12.05.2024 - Modifié(e) le:
12.05.2024